Childersburg, Alabama
Childersburg was selected as the site for a new oil blending and shipping facility. Mussett Nicholas Associates designed and documented a process piping, storage tank, and control system to blend 10,000,000 gallons of product per year.
Indianapolis, Indiana
Image, context, and scale responsiveness were key concerns in designing a two-story office and high-tech R&D and QC testing labs for a manufacturer. An atrium section with stairs and a two-entrance elevator creates a transition between the new and existing buildings on the site. Skylights enhance the office and lobby areas. Details of the new facade complement the original building.
West Lafayette, Indiana
Purdue University Zucrow High-Pressure Research Lab Air Heater Installation.
This project involved the installation of an air heater for the Purdue University Propulsion Lab to provide 150°F and 800 PSI compressed air for testing. The total cost of the project was $1.6 million.
West Lafayette, Indiana
Electrical services for the Mechanical Engineering Lateral included upgrading the tunnel lighting per Purdue’s Utility Tunnel electrical design specification. The mechanical services for the Lynn Hall Lateral and Under-Building Tunnel involved analyzing and replacing one existing steam anchor.
Jasonville, Indiana
The addition included a new maintenance repair shop, component rebuild center, two dyno rooms, offices, lube storage room, and training facility.
An additional 7,500-square-foot building was added to house the washing bay and sandblasting bay. The washing bay utilizes a water recycling center that reduces the use of domestic water.
Plainfield, Indiana
Mussett Nicholas Associates assisted Plainfield Community Schools in programming the facility for grades six through eight. Master planning for renovation work was staged over several summers to allow the school to remain functional and occupied. Decommissioning a centrally located pool, separating the school property from the town’s overloaded storm system, relocating kindergarten classrooms to three elementary schools, and interior remodels of the high school were all part of this project.
Bloomington, Indiana
Cook Pharmica included laboratory and cleanroom design, material storage, and support areas design, as well as mechanical and electrical utility systems design. Occupancy was available seven months following initiation of design.
Awards:
Bloomington, Indiana
Mussett Nicholas Associates has participated in a number of projects for Indiana University.
Work for Indiana University includes:
Jasonville, Indiana
This project was a new maintenance facility was constructed for the locomotives of the Indiana Rail Road Company. This operation has a fueling shed and can repair up to 4 locomotives inside the facility. This building also includes a maintenance shop with inspection pits, a warehouse, bulk oil storage, and office space. The facility has a unique oil-water waste recycling system.