Electrical services for the Mechanical Engineering Lateral included upgrading the tunnel lighting per Purdue’s Utility Tunnel electrical design specification. The mechanical services for the Lynn Hall Lateral and Under-Building Tunnel involved analyzing and replacing one existing steam anchor.